
FAQ CATEGORY 15/06/22
What is an insurance valuation and why does my scheme need one?
A strata scheme needs to take out insurance to cover damage to the building and other costs to reinstate or replace the buildings.
In order to determine to appropriate amount to insure the buildings for strata schemes obtain an insurance valuation which we suggest at least once every 3 years is most common.
It’s important that the valuation is not a reflection of the property prices but instead considers the costs of rebuilding the scheme in the event of total loss.
The valuation is generally based on
- Rebuilding costs at the date of calculation.
- Costs for demolition and removal of debris.
- Costs of all professional fees, including council fees and applications.
- An allowance for GST.
- Consideration for cost escalation during the rebuilding stages.
Buildings Forming Part of the Lot - 07/02/23
In most plans the external walls, the floors, roofs and ceilings of a building will be common property. In some cases the developer may request a plan where the building standing on each lot forms part of the lot and is not common property. These strata plans are commonly known as Cubic Strata Plans or Buildings Forming Part of a Lot. How do I tell if my strata property is a Cubic Strata Plan? The floor plan will be different from a normal plan in the following ways: The walls will be shown by thick broken lines unless they form a lot boundary. There will be only one floor plan regardless of the number of levels in the building. [...]
Meeting Notice Periods - 07/02/23
Learn about the different types of strata meetings and the required notice periods to call a meeting. Annual General Meeting | Extraordinary General Meeting | Inaugural General Meeting Notice Period - All Owners By Email* Emailed at least 7 days beforehand. Notice Period - If at Least One Owner Requires Post 7 days + 7 business days for postage. This means: Date of posting 7 business days for delivery Then 7 days notice First Annual General Meeting Notice Period - All Owners By Email* Emailed at least 14 days beforehand. Notice Period - If at Least One Owner Requires Post 14 days + 7 business days for postage. This means: Date of posting 7 business days for delivery Then 14 [...]
